For your Level 5 Project Management module, prepare a 10–12 minute kick-off presentation introducing an agile (Scrum) approach for a live client project, covering scope, team roles, the sprint plan, key risks and the criteria you will use to judge success.
Slide 1
NovaFit Booking App Redevelopment
Sprint 0 Stakeholder Briefing
Presented by: Project Team 4 (Scrum Master: J. Adeyemi)
Module: Project Management (Level 5) | Client: NovaFit Ltd
Speaker notes: Thank the client board for their time and briefly introduce the team before moving to the agenda slide.
Slide 2
Ten minutes, ten stops: from the problem we are solving through to how we will know the project has succeeded.
Slide 3
NovaFit Ltd operates 14 gyms across the North West and currently relies on a booking system built in 2016. Class bookings fail during peak demand, and 22% of app sessions are abandoned before a booking completes (internal analytics, July 2026). The support team fields around 90 booking-related calls a week, and three popular classes have been suspended after repeated double-booking errors.
Slide 4
Aim: deliver a reliable, mobile-first booking app within a 12-week programme that restores member confidence in the booking process.
Slide 5
Requirements for the booking flow are expected to change once real members test early releases, which favours an iterative approach over a fixed, sequential plan. A waterfall approach would lock down requirements before any member had touched a prototype, risking a costly rebuild late in the programme.
Speaker notes: If asked why not a traditional waterfall plan, point to the December 2025 pilot where fixed requirements caused three late change requests and a five-week overrun.
Slide 6
In scope: class booking, payment integration, push notifications, member profile and a self-service cancellation flow.
Out of scope (this release): personal-trainer scheduling, nutrition tracking, and loyalty points, all deferred to a phase-two backlog.
Anything outside this scope will be logged on the phase-two backlog rather than squeezed into the current sprint plan.
Slide 7
Slide 8
Six two-week sprints run across the 12-week programme:
| Sprint | Weeks | Focus | Key Deliverable |
|---|---|---|---|
| Sprint 1 | 1–2 | Backlog refinement, environment setup | Product backlog and dev environment live |
| Sprint 2 | 3–4 | Core booking flow | Class search and booking prototype |
| Sprint 3 | 5–6 | Payment integration | Working payment gateway (sandbox) |
| Sprint 4 | 7–8 | Notifications and profile | MVP release for pilot testing |
| Sprint 5 | 9–10 | Pilot feedback, bug fixes | Stabilised release candidate |
| Sprint 6 | 11–12 | Admin dashboard, UAT | Final build signed off for launch |
Speaker notes: The Sprint 4 MVP date is the milestone the client cares about most; pause here if the steering board has questions about the pilot cohort.
Slide 9
Risks are reviewed weekly by the Scrum Master and escalated to the steering board when likelihood or impact increases.
Slide 10
A short, predictable rhythm keeps the client informed without adding administrative overhead to the team.
Slide 11
Success will be judged against measurable targets agreed with the steering board, not general impressions.
Speaker notes: Tie each criterion back to the objectives on slide 4 so the board sees the plan is measurable, not just aspirational.
Slide 12
This kick-off has set out why an agile, Scrum-based approach fits a project with evolving requirements, the scope the team is committing to, the roles each person will play, and how progress will be reviewed every two weeks through working software rather than status reports.
Sprint 1 begins Monday, with the first sprint review scheduled in two weeks. The team will circulate the backlog and sprint calendar by email this afternoon. Thank you – we welcome your questions.
Slide 13
Key sources consulted in preparing this brief: